The problem, what you send, and what comes back. English speech.
Recent projects
New apartment building, 39 apartments
Quantity takeoff to support cost estimation
Source material
First working drawings – architectural and structural drawings plus the architect’s building information model
Scope
Talo 80 main groups 2–6
Deliverable
Bill of quantities for the project’s cost-estimation phase
Customer comment
“Working with 8root went well, and the company tailored the bill of quantities to our needs.”
Minna HautasaariHead of Cost Estimation, Rakennusliike Lapti Oy
New apartment building, 27 apartments
Quantity takeoff from BIM models and PDF drawings
Source material
Tender documentation – architectural, structural and building-services models plus the PDF drawings
Scope
Talo 80 main groups 1–7
Deliverable
Bill of quantities for the cost-estimation phase
Used for
Estimating the construction costs
Customer comment
“Looks good! If the quantities come at this level of accuracy, it will certainly save me time going forward.”
Lari KiviluomaHead of Estimation, Hausia Oy
How does it work?
IFCArchicad, Revit, Tekla+PDF
Send your files
IFC models and PDFs, by email or project bank.
We check the quantities
Models and documents combined. Cross-checked and expert-reviewed.
Receive your quantity lists
Excel or CSV, ready for cost estimating.
Our vision
From quantity takeoff to continuous construction data
Quantity takeoff is our starting point, not the destination. Our ambition is to make structured construction quantity data reusable, traceable, and responsive to design changes throughout the project lifecycle.
Available today
Detailed quantities for cost estimating
BIM models + PDF drawingsProcessed by 8root
Detailed quantity takeoffDelivered in Excel or CSV
Cost estimatingPriced by your team, not by 8root
Future capabilities
The same structured data, reused as designs evolve
Design informationStructural.ifc
Foundation formwork286 m²Foundation formwork, Revision A: 286 m²Baseline revisionLinked to Structural.ifc, Revision AIllustrative sample quantities
ProcurementQuantity information supporting purchasing and procurement decisions.Rev. A
ConstructionQuantity information supporting project execution.Rev. A
Carbon footprint calculationQuantity information serving as input for embodied carbon calculations.Rev. A
Quantity change tracking
Recognizing how quantities change when design information is revised.
Source traceability
Maintaining a connection between structured quantities and the original design information.
A sample project, end to end
Explore the model and a detailed quantity takeoff. All data shown is illustrative sample data.
Sample residential project
Sample data
Illustrative foundation takeoff
Sample quantities, not taken from this model
Code
Description
Quantity
Unit
211
Foundation formwork
211001
Formwork, stripping and cleaning
286
m²
2121
Foundation reinforcement
212101
Reinforcement, strip footings
9360
kg
212102
Reinforcement, pad footings
480
kg
212103
Reinforcement, waste and auxiliary steel, 20%
1968
kg
2122
Foundation concreting
212201
Concrete and placing, strip footings, C30/37, XC2, XC3
124
m³
Our team combines deep construction domain expertise with cutting-edge AI engineering.